Prediction Report
Ticket #JOB-5 · July 11, 2026 · Predicted
Submitted inputs · July 11, 2026 · 7:33 PM
Symptoms
Does it run at all?: trips on start
What does the motor drive?: pump
What changed?: restart after outage
Can you turn the shaft by hand, uncoupled?: unknown
Drive & installation
Coupling: belt
Isolated/locked out: no
Mounting: vertical
Environment: clean dry
Times rewound: Gemma
Shaft grounding/insulated bearing: yes
Tests
Surge: pass
Ground/continuity: fail
Vibration: 1x_speed_imbalance
Notes
Hi,
I was just looking at rotoragent.ai and wanted to ask: are you looking to scale your Instagram presence right now?
We help brands like yours add 300+ targeted Instagram followers every month using manual outreach and ads. We can grow your existing page or even build a brand-new profile from scratch for you if you'd prefer a fresh start.
Would you like me to send over some more info on how it works?
Thanks for your time,
Gemma
Executive summary
Motor trips on start at power restoration with a failed ground/continuity test — treat as a ground-fault until proven otherwise. DO NOT energize: the unit is not locked out. First action is LOTO, then a megger insulation-to-ground test to localize the fault.
Est. cost · internal
$1,700
Labor
14 hrs
Turnaround
5 business days
Repair vs. replace
Repair (size unknown — confirm HP)
Likely failure mode
Mediumground-wall insulation failure
MediumMoisture/contamination surface fault after the outage caused a recoverable ground reading, not degraded ground-wall insulation
Lowground fault in cabling/connections, not motor
Required repairs
• Rewind or repair stator ground-wall insulation, pending teardown confirmation
• Clean, dip and bake windings if fault proves to be moisture/contamination, pending PI/IR results
• Dynamic balance rotor / correct belt-drive imbalance, pending vibration re-check
Material staging
Magnet wire (copper, rewind) ×lot · ~4d lead
98% likelyorder before teardown
Insulation kit — slot liners, wedges, phase paper ×1 set · ~3d lead
98% likelyorder before teardown
DE bearing ×1 · ~2d lead
95% likelyorder before teardown
ODE bearing ×1 · ~2d lead
95% likelyorder before teardown
Shaft / bearing seals ×set · ~1d lead
90% likelycheck stock
Varnish / resin (VPI or dip-and-bake) ×as req
95% likelycheck stock
Lead wire & sleeving ×as req · ~1d lead
80% likelycheck stock
Labor — 14 hrs total
Teardown & clean
2.1 hStrip & rewind
6.3 hFit new bearings
1.1 hVPI / dip & bake
1.7 hReassemble
1.7 hTest & balance
1.1 hReinstall & coverage
• Reinstall & laser alignment on site — field service, quoted separately
• 12-month workmanship warranty — carried in the estimate
• Preventive maintenance plan — optional add-on
Sharpen estimate
Add evidence to tighten the estimate and raise confidence:
• Insulation resistance + polarization index (IEEE 43) — separates a full rewind from a cleanable/bakeable winding — the biggest cost swing
• Winding-resistance balance — flags opens / bad connections vs. a sound winding
• Photo of the winding (burn pattern) — burn pattern often fixes the mode and the rewind extent
• insulation resistance value + polarization index — reduces remaining uncertainty in the scope
Confirmed outcome
Reasoning
ground-wall insulation failure — tests: ground/continuity fail; questions: trips on start after outage restart
Moisture/contamination surface fault after the outage caused a recoverable ground reading, not degraded ground-wall insulation — QUESTION ANSWERS: fault appeared on restart after outage, consistent with condensation/moisture ingress during downtime; TEST INPUTS: surge test pass indicates turn-to-turn and winding dielectric intact, pointing to a surface leakage path rather than bulk insulation breakdown
ground fault in cabling/connections, not motor — belt-coupled + external supply path — fault may live upstream of motor
mechanical imbalance (secondary) — tests: vibration dominant 1x_speed_imbalance
No nameplate, no insulation value, and no identification of the tripping device cap overall confidence; the ground-fault call rests on a single pass/fail test channel without a measured IR to grade it.
Begin repair — staged actions
Review before anything fires. Nothing is sent in this demo.
1 · Draft quote
Internal estimate $1,700 · 14 hrs → estimator review
2 · Order now (long-lead)
- Magnet wire (copper, rewind)
- Insulation kit — slot liners, wedges, phase paper
- DE bearing
- ODE bearing
3 · Check stock
- Shaft / bearing seals
- Varnish / resin (VPI or dip-and-bake)
- Lead wire & sleeving
4 · Work order
Assign tech + bay; labor feeds the schedule
5 · Promised-by
July 31, 2026 (turnaround + parts lead)