Prediction Report
Ticket #JOB-2 · July 9, 2026 · Predicted
Submitted inputs · July 9, 2026 · 5:27 PM
Nameplate
hp: 75
rpm: 1180
frame: 365T
voltage: 460
phase: 3
Symptoms
Does it run at all?: trips on start
Drive & installation
Environment: washdown wet
Shop queue: 2 days
Tests
Insulation resistance: 2.0 MΩ @ 500.0 V
Polarization index: 1.1
Surge: fail
Winding resistance: [0.4, 0.41, 0.4]
Ground/continuity: fail
Notes
sat outside through winter, trips on start, rust on conduit box
Executive summary
Multiple hard-failure signals converge on a ground-wall/turn insulation breakdown: fails ground continuity, fails surge, low PI (1.1) with marginal insulation resistance, and trips on start after a wet winter. Keep locked out — do not attempt to run. Confirm and localize with insulation and surge testing; this motor is almost certainly headed for rewind.
Est. cost · internal
$5,200
Labor
49 hrs
Turnaround
11 business days
Repair vs. replace
Repair if cost < ~60% of a new motor; otherwise replace
Likely failure mode
Highground-wall insulation failure to frame
Mediumturn-to-turn / phase winding short
Lowmoisture/contamination surface tracking (recoverable)
Required repairs
• Rewind stator (pending teardown/test confirmation)
• Clean, dip and bake windings if drying reveals recoverable moisture only (pending confirmation)
• Clean/re-terminate and seal conduit box; address moisture ingress path
Material staging
Magnet wire (copper, rewind) ×lot · ~4d lead
98% likelyorder before teardown
Insulation kit — slot liners, wedges, phase paper ×1 set · ~3d lead
98% likelyorder before teardown
DE bearing ×1 · ~2d lead
95% likelyorder before teardown
ODE bearing ×1 · ~2d lead
95% likelyorder before teardown
Shaft / bearing seals ×set · ~1d lead
95% likelycheck stock
Varnish / resin (VPI or dip-and-bake) ×as req
95% likelycheck stock
Lead wire & sleeving ×as req · ~1d lead
80% likelycheck stock
Labor — 49 hrs total
Teardown & clean
7.3 hStrip & rewind
22.1 hFit new bearings
3.9 hVPI / dip & bake
5.9 hReassemble
5.9 hTest & balance
3.9 hReinstall & coverage
• Reinstall & laser alignment on site — field service, quoted separately
• 12-month workmanship warranty — carried in the estimate
• Preventive maintenance plan — optional add-on
Sharpen estimate
Add evidence to tighten the estimate and raise confidence:
• Photo of the winding (burn pattern) — burn pattern often fixes the mode and the rewind extent
• IR/PI after controlled oven-dry (recovers or not) — reduces remaining uncertainty in the scope
• Which phase the ground fault localizes to — reduces remaining uncertainty in the scope
Confirmed outcome
Reasoning
ground-wall insulation failure to frame — tests: ground/continuity fail; tests: PI 1.1 (poor, non-recovering)
turn-to-turn / phase winding short — tests: surge test fail; physics: 2% winding-resistance imbalance flags asymmetry
moisture/contamination surface tracking (recoverable) — free text: sat outside through winter, washdown/wet, rust on conduit box
poor connection at conduit box (rust/corrosion) — free text: rust on conduit box; physics: winding-resistance imbalance
No confirmation of whether insulation recovers after drying; without a post-dry IR/PI the split between hard ground-wall failure and recoverable moisture cannot be fully settled, capping overall confidence.
Begin repair — staged actions
Review before anything fires. Nothing is sent in this demo.
1 · Draft quote
Internal estimate $5,200 · 49 hrs → estimator review
2 · Order now (long-lead)
- Magnet wire (copper, rewind)
- Insulation kit — slot liners, wedges, phase paper
- DE bearing
- ODE bearing
3 · Check stock
- Shaft / bearing seals
- Varnish / resin (VPI or dip-and-bake)
- Lead wire & sleeving
4 · Work order
Assign tech + bay; labor feeds the schedule
5 · Promised-by
August 06, 2026 (turnaround + parts lead)